Friday, November 26, 2010

Gyprock started

Here is the beginning of the gyprocking. This is the media room.


Posted by Picasa

Outside and inside


Here we have the roof over the garage being installed, the ducted air conditioning and the upper floor before the gyprock goes up.

Posted by Picasa

Inside....bathrooms






Here are a few pics from inside.

We have done the water proofing and tiling of the walls.

The first couple of pics are of our ensuite bathroom with the spa bath and the double shower.

The last pic is of the bath in the kids bathroom