We have filled in all the trenches around the sub floor and the next step is the order the steel (tomorrow) for the bearers and joists for the lower levels. As you can see, Chris has been busy measuring up - unfortunately due to the rain, we have a bit of a swimming pool.
The orange around the perimeters is Kordon, our termite protection and the black paint on the walls is our water proofing.