On 14 March Roland emailed us the top floor. Quite different to what we had originally designed. A much bigger bedroom (yay!) but my long corridor which was to be my library had disappeared and the plumbing was no long centralised.
Anyway, we worked a bit on the bottom floor (although pretty happy with it) and emailed it back on March 17. Tonight we are going to work on the top floor so I can scan it tomorrow at work and email it back. We are crossing our fingers for submitting to council by the end of the month but that might be a wee bit optimistic.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment