Here is our lovely working spa bath - can't wait to use it~!
Here is our downstairs bathroom and functioning toilet :)
This is the laundry looking towards the back door and you can see the huge cupboard on the right which has shelves all down one side and a long open section on the right for the ironing board, brooms etc
The other side of the laundry.
Our lovely kitchen!! This is our three metre bench.
The 6 "secret" cupboards
Our great pot drawers.
The Oliveri sink
The quantum quartz benchtops being weighted down over night.
Tada! With the benchtops on. So Alpine White QQ - 60mm the whole way round.
Very happy with the waterfall edge.
Lots of light being reflected.
Needs to be plumbed and then we can get the appliances in.
The sink in situ.
The (almost) finished product.
Sunday, July 31, 2011
Sunday, July 17, 2011
The Kitchen
Our kitchen has finally gone in!!
We settled on natural white for the cupboards and our benchtops will be Caesarstone "Snow"
We are sourcing our benchtops separately so we can shop around. Also, now that the carcass is in situ, when the stone masons measure up they will be more accurate than just off the plan.We settled on natural white for the cupboards and our benchtops will be Caesarstone "Snow"
Our breakfast bench is 3m long and has lovely deep pot drawers. We also have "secret" doors on the other side.
Looking out towards the alfresco area and backyard.
We are pretty happy with it so far. Very much looking forward to getting the benchtops on.


Saturday, May 28, 2011
Our rosegum floors
Yay! Our floors are going down. This is how much they got done in just over a day. I am so impressed. For once, we seem to have reliable tradesmen who turn up when they say they will and work quickly.
Here is the rosegum laid over the bridge to the media room.
a close up of the timber. I am really happy with it. It has lovely depth and although Standard Grade, is of a high quality. I really do like the odd character feature in it.
The family room
The hallway from the kitchen to the formal lounge
The study, which is half done
The formal lounge waiting to be done
Timber laid out in the kitchen ready to go
Sunday, May 15, 2011
MORE PICS
So, we are slowly making progress, although Chris now has to go away for three weeks for work - not negotiable. Not only does this delay us (again) but he will also miss my birthday, mum's 60th and, most importantly, Immie's 1st bIrthday! NOT HAPPY! :(
here is our lovely staircase up to the media room.
Our vanities are in now although still need to be plumbed. This is our ensuite - the spa is to the right and behind me is the double shower.here is our lovely staircase up to the media room.
This is the main bathroom vanity
The guest room vanity
The library - the first room to be painted.
Me and my little girl
Immie exploring her new house
Chris and Immie in the family room
Climbing her new stairs - note the proud expression :)
Daddy lending a helping hand
Up we go again.
Saturday, April 23, 2011
Stair pics
Stairs leading from the entrance level to the second bedroom level then up again across the bridge and into the media/games room
Stairs from the entrance level up to the second level
Stairs heading up the entrance level from the bottom level
Looking towards the bridge and the bottom level from the front door
All the stairs plus the bridge
Subscribe to:
Posts (Atom)